Worldwide Integrated Digital Telecommunications Systems
(WIDTS)
Contract No. F04606-97-D-0059
Site Specific Installation Plan
For
Frame Relocation
D.O. # 176
CDRL Sequence No. E005
Issue 1.0
17 January 2001
Prepared for:
Department of the Air Force
Headquarters Sacramento Air Logistics Center (AFMC)
Hill AFB, Utah
Prepared by:
Table of Contents
SUBJECT Page
INTRODUCTION
*Overview
*Major Milestones Required for the Scheduling of Activities
*METHOD OF PROCEDURE to be Utilized
*Responsibility for each Task Required at EIELSON AFB
*Responsibility for each Task Required at Eielson AFB, Contd.
*Facility Equipment to be Changed or Installed for the Upgrade 4
Identification Of Any Planned Disruptions Incident to the Installation.
*
Attachment Contents
A
Equipment to be installed at Eielson AFBB Lineup of GFE Frames to be Installed
C Host Office Drawing
D Eielson AFB ISRD
I
NTRODUCTION
This document, prepared in accordance with DID DI-MGMT-80033, establishes the Site Specific Installation Plan to engineer, furnish, install and test (EFI&T) GFE frame relocation project at Eielson AFB, Alaska.
| Eielson AFB Activities |
General Dynamics install the
following GFE frames at the Host Switch (SL100) located at 3110 Wabash Avenue, Building
3110, Eielson AFB, Alaska: MCAM2 00 MCTM-00 MCTM-01 MCLM-04 MCLM-05 MCLME-06 MCSS-01 The above frame designations for the MCTM, MCLM and MCLME equipment reflect the new designations for this equipment. Currently, this equipment is labelled MCTM 01, MCTM 02, MCLM 00, MCLM 01,and MCLME 03. |
| Equipment to be Upgraded/ Installed |
General Dynamics shall provide all hardware and software necessary to EFI&T the relocation of GFE frames in accordance with the Statement of Work (SOW). A list of equipment to be installed is contained in Attachment A. |
Major Milestones Required for the Scheduling of Activities
A top-down major milestone schedule for the EFT&I the GFE frame relocation at Eielson AFB is as follows
Equipment Ship Date: 05 March 2001
Installation Start Date: 20 March 2001
Installation Completion: 05 May 2001.
The proposed Installation schedule is contingent upon Government signing 80% billing form when equipment arrives at Eielson AFB.
General Dynamics recommends a Monday through Friday 0700-1800 work schedule to support scheduled completion date.
Method of Procedure to be Utilized
A Method of Procedure will be given to the site upon arrival of the installation team. in preparation for this installation, a site survey was conducted on 17 January 2001. A copy of the site survey was submitted to Eielson AFB and approved on 7 February 2001.
Responsibility for each Task Required at Eielson AFB
General Dynamics will perform all tasks identified in the Eielson AFB SOW dated 09 July 2000. The following is a high level summary of requirements necessary to support this effort.
Task |
Responsibility |
Comments |
| Identify requirements for storage/ working facilities. | General Dynamics | |
| Provide storage/working facilities. | Government | |
| Provide a list of secure or restricted areas where escort, special clearance, or special technical requirements exist (Emergency Operations Centers, firing ranges, etc.), and how WIDTS can get access. | Government | |
| Identify any planned major military exercises or deployments that might affect our schedule or access to certain areas of the Base. | Government | |
| Define any specific badge requirements for personnel and vehicles on site. | Government | |
| If Government clearances are required, provide the required information. | General Dynamics | |
| Identify the requirements for vehicles on the Base. including speed limits, possession of current license, vehicle registration, insurance, issuing of tickets, and Magistrate appearances. | Government | |
| Completion of Site Preparations are outlined in "Changes/Deletions" section of this SSIP. | Government | |
| Provide required test support. | Government/ General Dynamics | |
| Identify site drawings, floor plans, interconnection diagrams, etc.required to plan the EFI&T of the GFE frame relocation. (Attachment B and C) | General Dynamics | |
| Provide required drawings. | Government |
Responsibility for each Task Required at Eielson AFB, Contd.
Task |
Responsibility |
Comments |
| Install equipment new hardware and software as required. | General Dynamics | |
| Perform system testing on the upgraded telecommunications system, this includes both new and relocated equipment. | General Dynamics | |
| Witness and sign off on testing certification sheets, as required. | Government | |
| Identify Government support required for audits and special post-installation testing. | General Dynamics | |
| Provide support for all audits and special post-installation testing. | Government | |
| Identify Government support required for EFI&T of the GFE frame relocation. | General Dynamics | |
| Provide installation support. | Government | |
| EFI&T the relocation of GFE frames. | Government/ General Dynamics | |
| Remove old switching equipment, including all applicable power equipment. | Government | |
| Run, secure , & terminate commercial AC power from the TPP to the General Dynamics provided rectifiers | Government | |
| Disposition GFE equipment | Government |
Facility Equipment to be Changed or Installed for the Upgrade
| EQUIPMENT: | Information (e.g., scope of work, installation instructions, drawings) regarding the major equipment to be installed is located in the Eielson AFB, Utah is identified in Attachments A. |
| Equipment Placement | A site layout plan including detailed layouts (placement) of all equipment, racks cabinets and consoles is provided herein as Attachment B and C. |
Installation/ Changes Required
The following changes and/or installations will be performed by the Government at Building 3110 (Host):
B. Air-conditioning: The air conditioning should be adjusted to meet the environmental requirements as shown below. The heat dissipation of the equipment can be calculated by adding the BTU/HR figures for each piece of equipment shown above. Note:for some frames, there are multiple cabinets/frames (ex: MCTM 00-01 is a total of 2 cabinets) and the BTU/HR should be figured accordingly (in the MCTM example the figure 5324 should be multiplied by 2). The air vents MUST NOT be positioned so that the air is blowing directly on the equipment frames.
C. Lighting/AC Outlets: The lighting and AC outlets are adequate.
E. Grounding requirements: The grounding is adequate.
3. ENVIRONMENTAL REQUIREMENTS
A. The MSL-100 equipment must be installed in a computer type environment to ensure maximum equipment reliability and life span. The following standards must be met: The air cleanliness in the MSL-100 switch room should be equal to or better than class 100,000 (i.e., not more than a total of 100,000 particles per cubic feet of a size 0.5 micron or larger).
B. Operating Temperature and Humidity: The recommended ambient temperature range of the MSL-100 is between 10 to 30 degrees Centigrade (50 to 86 degrees Fahrenheit), with extreme limits 5 to 49 degrees Centigrade (41 to 120 degrees Fahrenheit). The recommended operating relative humidity range is between 20% to 50% with extreme limits at 20% to 80%. The maximum rate of temperature cycling should not exceed 1 degree Centigrade per 10 minutes. For maximum battery life, it is recommended that the battery room be kept between 75-77 degrees Fahrenheit at all times. Operation above 80 degrees Fahrenheit will reduce battery life, operation below 65 degrees Fahrenheit will reduce battery efficiency.
C. Equipment physical data: see item 1B above and the floor plan.
4. OTHER REQUIREMENTS
A. Floor loading: The Government must insure the weight does not exceed building floor loading capacity.
B. Floor tolerances: The maximum deviation from the established floor elevation should not exceed one inch. The maximum difference in elevation between low and high should not exceed three quarters of an inch within a twenty foot square.
C. Equipment entrance/unloading area: The Government should provide a route between the unloading area and the switch room where no restrictions will be encountered with less clearance than 36" wide, side to side, and 84" high, floor to obstruction. Turns along the route shall allow sufficient clearance to turn or tilt an object 28"D x 28.5"W x 78"H.
D. Storage: The Government shall provide adequate secure dry storage for all General Dynamics equipment.
E. Physical security requirements: shall be provided by the Government in accordance with local practices.
F. Work location: The Government shall furnish any material and services required to restore the work location to its original condition (including painting, replacing floor tiles, etc.) once the normal installation phase has been completed.
G. Equipment damage: General Dynamics will not be responsible for damage to equipment caused by leakage or other conditions caused by customer's facilities including but not limited to fire sprinklers, overhead pipes, air conditioning systems, air ducts, etcetera. If fire sprinklers are required, General Dynamics recommends the "Dry Charged" type. General Dynamics also recommends drip pans be placed above any equipment where conditions require it.
.
Identification Of Any Planned Disruptions Incident to the Installation.
Any disruption of service that will occur at Eielson AFB will be coordinated with the Base communications Officer at least 30 days prior to the outage.
Prior to any installation or removal activity, each task will be identified, agreed upon, and assigned to the Government or General Dynamics for completion. This SSIP contains check lists in the paragraphs entitled "Responsibility for Each Task Required at Eielson AFB" to facilitate tracking the accomplishment of all items.
Eielson AFB SSIP
Attachment A
Equipment to be Installed at Eielson AFB
| SECTION 1 : (GFE) HOST MSL-100 HARDWARE | ||||||||||||||||
| MCAM-00 (Government will provide the following hardware:) | ||||||||||||||||
| NTNX37AB | MERIDIAN CABINET AUXILIARY MODULE | 0 |
||||||||||||||
| NTNX25AA | COMMON FRAMEWORK | 0 |
||||||||||||||
| NT7X34AA | FRAME SUPERVISORY PANEL (SH POS 60) | 0 |
||||||||||||||
| NT7X3501 | PTM SH ASSEMBLY (SH POS 47,33) | 0 |
||||||||||||||
| NTNX2401 | PDP SHELF ASSEMBLY (SH POS 00) | 0 |
||||||||||||||
| NTNX24BA | POWER DISTRIBUTION PANEL (SH POS 00) | 0 |
||||||||||||||
| NTNX2515 | DOOR ASSEMBLY LEFT | 0 |
||||||||||||||
| NTNX2513 | DOOR ASSEMBLY RIGHT | 0 |
||||||||||||||
| SHELF POS 47 (PTM 03) | ||||||||||||||||
| NT2X58CA | PTM SH ASSEMBLY (SH POS 47) | 0 |
||||||||||||||
| NT2X45AB | FILLER FACEPLATE | SH 47: 1 | 0 |
|||||||||||||
| NT0X70AC | TM CONTROL CP | SH 47: 2 | 0 |
|||||||||||||
| NT2X53AA | GROUP CODEC | SH 47: 3 | 0 |
|||||||||||||
| NT2X59AA | MULTI-OUTPUT POWER CONVERTER | SH 47: 4 | 0 |
|||||||||||||
| NT0X50AA | FILLER FACEPLATE | SH 47: 19 | 0 |
|||||||||||||
| NT2X70AE | POWER CONVERTER | SH 47: 20 | 0 |
|||||||||||||
| NT2X71AA | TRANSMISSION TERMINATION TRUNK | SH 47: 5 | 0 |
|||||||||||||
| NT2X75AA | LOOP AROUND TEST LINE | SH 47: 6 | 0 |
|||||||||||||
| NT3X09BA | 8X8 METALLIC TEST ACCESS CP | SH 47: 8,9 | 0 |
|||||||||||||
| NT1X00AC | ROH TONE GENERATOR CP | SH 47: 11 | 0 |
|||||||||||||
| NT0X50AC | FILLER FACEPLATE | SH 47: 12 | 0 |
|||||||||||||
| NT2X10BA | MTU ANALOG CP | SH 47: 13 | 0 |
|||||||||||||
| NT2X11BA | MTU DIGITAL CP | SH 47: 14 | 0 |
|||||||||||||
| NT2X90AD | INC/OUT TEST TRUNK CP | SH 47: 15 | 0 |
|||||||||||||
| NT3X68AC | TONE GENERATOR, CALL WAITING | SH 47: 16 | 0 |
|||||||||||||
| NT2X09AA | MULTI-OUTPUT POWER CONVERTER | SH 47: 17 | 0 |
|||||||||||||
| SHELF POS 33 (PTM 02) | ||||||||||||||||
| NT2X58CA | PTM SH ASSEMBLY (SH POS 33) | 0 |
||||||||||||||
| NT2X45AB | FILLER FACEPLATE | SH 33: 1 | 0 |
|||||||||||||
| NT0X70AC | TM CONTROL CP | SH 33: 2 | 0 |
|||||||||||||
| NT2X53AA | GROUP CODEC | SH 33: 3 | 0 |
|||||||||||||
| NT2X59AA | MULTI-OUTPUT POWER CONVERTER | SH 33: 4 | 0 |
|||||||||||||
| NT0X50AA | FILLER FACEPLATE | SH 33: 19 | 0 |
|||||||||||||
| NT2X70AE | POWER CONVERTER | SH 33: 20 | 0 |
|||||||||||||
| NT5X30AA | 101 COMM TEST LINE | SH 33: 5 | 0 |
|||||||||||||
| NT5X30AA | 101 COMM TEST LINE | SH 33: 6 | 0 |
|||||||||||||
| NT0X10AA | MISCELLANEOUS SCAN CP | SH 33: 7 | 0 |
|||||||||||||
| NT5X30AA | 101 COMM TEST LINE | SH 33: 8 | 0 |
|||||||||||||
| NT0X50AC | FILLER FACEPLATE | SH 33: 9,12,13,14,16 | 0 |
|||||||||||||
| NT3X68AA | TONE GENERATOR, CALL WAITING | SH 33: 10 | 0 |
|||||||||||||
| NT3X09BA | 8X8 METALLIC TEST ACCESS CP | SH 33: 8,9 | 0 |
|||||||||||||
| NT1X00AC | ROH TONE GENERATOR CP | SH 33: 11 | 0 |
|||||||||||||
| NT0X50AC | FILLER FACEPLATE | SH 33: 12 | 0 |
|||||||||||||
| NT2X09AA | MULTI-OUTPUT POWER CONVERTER | SH 33: 17 | 0 |
|||||||||||||
| SHELF POS 19 (STM 08/STM 09) | ||||||||||||||||
| NT7X3004 | STM SHELF ASSEMBLY | 0 |
||||||||||||||
| NT0X50AG | FILLER FACEPLATE | SH 19: 1 | 0 |
|||||||||||||
| NT0X50AC | FILLER FACEPLATE | SH 19: 3 | 0 |
|||||||||||||
| NT4X65AB | TM CONTROL CP | SH 19: 4 | 0 |
|||||||||||||
| NT0X50AA | FILLER FACEPLATE | SH 19: 4 | 0 |
|||||||||||||
| NT2X70AE | POWER CONVERTER | SH 19: 19 | 0 |
|||||||||||||
| LEFT/RIGHT SIDE PROVISIONABLES | SH 19: 20 | |||||||||||||||
| NT1X75AA | DRAM CONTROL CP | SH 19: 5 | 0 |
|||||||||||||
| NT1X77AA | DRAM RAM MEMORY CP | SH 19: 6,7,8,9 | 0 |
|||||||||||||
| NT0X50AC | FILLER FACEPLATE | SH 19: 10,11 | 0 |
|||||||||||||
| NT4X65AB | TM CONTROL CP | SH 19: 12 | 0 |
|||||||||||||
| NT3X67AA | 6-PORT CONFERENCE CP | SH 19: 12,13,14,15 | 0 |
|||||||||||||
| NT2X59AA | GROUP CODEC | SH 19: 17 | 0 |
|||||||||||||
| The Government will provide the following hardware: | ||||||||||||||||
| MCTMI-00 | ||||||||||||||||
| NTNX33CA | MERIDIAN CABINET ISDN TRUNK MODULE | 1 |
||||||||||||||
| NTNX25AA | COMMON FRAMEWORK | 1 |
||||||||||||||
| NTNX26NA | FRAME SUPERVISORY PANEL (SH POS 60) | 1 |
||||||||||||||
| NT6X0215 | CPCE SH ASSEMBLY (SH 47,33,19,05) | 1 |
||||||||||||||
| NTNX27CA | COOLING UNIT (SH POS 00) | 1 |
||||||||||||||
| NTNX2515 | DOOR ASSEMBLY LEFT | 2 |
||||||||||||||
| NTNX2513 | DOOR ASSEMBLY RIGHT | 2 |
||||||||||||||
| NTNX33DU | DS-30A LINKS | 1 |
||||||||||||||
| NTNX33DV | DS1 INTERFACE KIT | 1 |
||||||||||||||
| NTNX33DT | DS30A I/F HARDWARE KIT (NT6X48AA) | 1 |
||||||||||||||
| NTNX36NI | JUMPER KIT FOR BASE | 1 |
||||||||||||||
| LOWER MODULE SHELVES 05 & 19 | ||||||||||||||||
| NTNX33NA.LGCI | CPCE PACK-FILL (E/W:) | 1 |
||||||||||||||
| NT2X70AE | POWER CONVERTER | 2 |
||||||||||||||
| NT6X41AA | SPEECH BUS FORMATTER CP | 2 |
||||||||||||||
| NT6X42AA | CHANNEL SUPERVISION MSG CP | 2 |
||||||||||||||
| NT0X50AA | FILLER FACEPLATE | 10 |
||||||||||||||
| NT6X44AB | TIME SWITCH CP | 2 |
||||||||||||||
| NT6X92BB | UNIVERSAL TONE RECEIVER CP | 2 |
||||||||||||||
| NT6X69AC | MSG INTERFACE CP | 2 |
||||||||||||||
| NT6X40AC | DS-30 NETWORK I/F CP | 0 |
||||||||||||||
| UPPER MODULE SHELVES 33 & 47 | ||||||||||||||||
| NTNX33NB.LGCI/DTCI | CPCE PACK-FILL (E/W:) | 1 |
||||||||||||||
| NT2X70AE | POWER CONVERTER | 2 |
||||||||||||||
| NT6X41AA | SPEECH BUS FORMATTER CP | 2 |
||||||||||||||
| NT6X42AA | CHANNEL SUPERVISION MSG CP | 2 |
||||||||||||||
| NT0X50AA | FILLER FACEPLATE | 10 |
||||||||||||||
| NT6X44AB | TIME SWITCH CP | 2 |
||||||||||||||
| NT6X92BB | UNIVERSAL TONE RECEIVER CP | 2 |
||||||||||||||
| NT6X69AC | MSG INTERFACE CP | 2 |
||||||||||||||
| NT6X40AC | DS-30 NETWORK I/F CP | 0 |
||||||||||||||
| PROVISIONABLES: | ||||||||||||||||
| NT6X48AA | DS-30A LCM INTERFACE CP | 8 |
||||||||||||||
| NTBX01AA | ISDN SIGNAL PREPROCESSOR CP | 5 |
||||||||||||||
| The Government will provide the following hardware: | ||||||||||||||||
| MCLM-00, 01, 02 | ||||||||||||||||
| NTNX38AA | MERIDIAN CABINET LINE MODOLE | 2 |
||||||||||||||
| NTNX25AA - COMON FRAMEWORK | 2 |
|||||||||||||||
| NTNX26BA - FSP | 2 |
|||||||||||||||
| NTNX15AA - ENHANCED FUSE PANEL | 2 |
|||||||||||||||
| NTNX1201 - ELM SHELF ASSEMBLY | 4 |
|||||||||||||||
| NTNX1203 - ENHANCED BP TERM | 4 |
|||||||||||||||
| NTNX27DA - CU | 2 |
|||||||||||||||
| NTNX38LA | ELM LOWER MODULE CP | 05,19 | 2 |
|||||||||||||
| NT6X52AA - DIGGROUP CONTROL CP | 4 |
|||||||||||||||
| NT6X53AA - POWER CONVERTER CP | 4 |
|||||||||||||||
| NT6X51AC - LCM PROCESSOR CP | 4 |
|||||||||||||||
| P0687853 - DESIGNATION STRIP | 4 |
|||||||||||||||
| NTNX38LB | ELM UPPER MODULE CP | 47,33 | 2 |
|||||||||||||
| NT6X52AA - DIGGROUP CONTROL CP | 4 |
|||||||||||||||
| NT6X53AA - POWER CONVERTER CP | 4 |
|||||||||||||||
| NT6X51AC - LCM PROCESSOR CP | 4 |
|||||||||||||||
| P0687853 - DESIGNATION STRIP | 4 |
|||||||||||||||
| NT6X05AA | LINE DRAWER CP | 1032 |
32 |
|||||||||||||
| A0384362 | LINE DRAWER CUTOFF STRAP | 1032 |
32 |
|||||||||||||
| NT6X60AA | RINGING GENERATOR CP | 1032 |
4 |
|||||||||||||
| NTNX2513 | RIGHT DOOR ASSEMBLY (GREY) | 1032 |
4 |
|||||||||||||
| NTNX2515 | LEFT DOOR ASSEMBLY (GREY) | 1032 |
4 |
|||||||||||||
| NTBX31AB | LCM FILLER FACE PLATE | 1032 |
0 |
|||||||||||||
| NT6X05AX | LINE DRAWER FILLER | 1032 |
0 |
|||||||||||||
| NT6X17AC | TYPE A LINE CARD | 1032 |
1,347 |
|||||||||||||
| NT6X21AC | TYPE C LINE CARD | 1032 |
110 |
|||||||||||||
| MCPM-00 Government will provide the following hardware: | ||||||||||||||||
| NTNX24AA | MERIDIAN CABINET POWER MODULE | 1 |
||||||||||||||
| NTNX25AA | COMMON FRAMEWORK | 1 |
||||||||||||||
| NT7X34AA | FRAME SUPERVISORY PANEL (SH POS 60) | 1 |
||||||||||||||
| NT4X00AF | DDU SHELF ASSEMBLY UNIT (SH POS 19) | 0 |
||||||||||||||
| NT4X00AG | 5.25" 220MB DISK DRIVE (SH POS 19) | 10,18 | 0 |
|||||||||||||
| NT1X78AA | POWER CONVERTE4 FOR DDU (SH POS 19) | 2,26 | 0 |
|||||||||||||
| NT2X58CA | PTM SH ASSEMBLY (SH POS 47,33) | 1 |
||||||||||||||
| NTNX2401 | PDP SHELF ASSEMBLY (SH POS 00) | 1 |
||||||||||||||
| NTNX24BA | POWER DISTRIBUTION PANEL (SH POS 00) | 1 |
||||||||||||||
| NTNX2515 | DOOR ASSEMBLY LEFT | 2 |
||||||||||||||
| NTNX2513 | DOOR ASSEMBLY RIGHT | 2 |
||||||||||||||
| SHELF POS 47 (PTM 00) - PROVISIONABLE | ||||||||||||||||
| NT2X45AB | FILLER FACEPLATE | SH 47: 1 | 2 |
|||||||||||||
| NT0X70AC | TM CONTROL CP | SH 47: 2 | 1 |
|||||||||||||
| NT2X53AA | GROUP CODEC | SH 47: 3 | 1 |
|||||||||||||
| NT2X59AA | MULTI-OUTPUT POWER CONVERTER | SH 47: 4 | 1 |
|||||||||||||
| NT3X82AB | OAU DEAD SYS W/COMM AUDIBLE | SH 47: 5 | 0 |
|||||||||||||
| NT3X83AA | OAU ALARM TRANSFER CP | SH 47: 6 | 0 |
|||||||||||||
| NT0X10AA | MISCELLANEOUS SCAN CP | SH 47: 7 | 1 |
|||||||||||||
| NT2X57AA | SIGNAL DISTRIBUTION CP | SH 47: 8 | 1 |
|||||||||||||
| NT2X47AD | TRANSMISSION TEST UNIT CP | SH 47: 9 | 1 |
|||||||||||||
| NT1X90AA | TEST SIGNAL GENERATOR CP | SH 47: 11 | 1 |
|||||||||||||
| NT2X96AA | PCM LEVEL METER CP | SH 47: 12 | 1 |
|||||||||||||
| NT0X50AA | FILLER FACEPLATE | SH 47: 13 | 1 |
|||||||||||||
| NT0X50AA | FILLER FACEPLATE | SH 47: 14 | 1 |
|||||||||||||
| NT3X02AA | TOPS CONTROL PROCESSOR CP | SH 47: 15 | 1 |
|||||||||||||
| NT3X03AA | TOPS DIGITAL SIG PROCESSOR CP | SH 47: 16 | 1 |
|||||||||||||
| NT2X09AA | MULTI-OUTPUT POWER CONVERTER | SH 47: 17 | 1 |
|||||||||||||
| NT0X50AA | FILLER FACEPLATE | SH 47: 19 | 1 |
|||||||||||||
| NT2X70AE | POWER CONVERTER | SH 47: 20 | 1 |
|||||||||||||
| SHELF POS 33 (PTM 01) - PROVISIONABLE | ||||||||||||||||
| NT2X45AB | FILLER FACEPLATE | SH 33: 1 | 1 |
|||||||||||||
| NT0X70AC | TM CONTROL CP | SH 33: 2 | 1 |
|||||||||||||
| NT2X53AA | GROUP CODEC | SH 33: 3 | 1 |
|||||||||||||
| NT2X59AA | MULTI-OUTPUT POWER CONVERTER | SH 33: 4 | 1 |
|||||||||||||
| NT3X82AB | OAU DEAD SYS W/COMM AUDIBLE | SH 33: 5 | 0 |
|||||||||||||
| NT5X30AA | 101 COMM TEST LINE | SH 33: 6 | 1 |
|||||||||||||
| NT1X54AA | JACK ENDED TRUNK CP | SH 33: 7 | 1 |
|||||||||||||
| NT0X50AA | FILLER FACEPLATE | SH 33: 8,19 | 2 |
|||||||||||||
| NT2X47AD | TRANSMISSION TEST UNIT CP | SH 33: 9 | 1 |
|||||||||||||
| NT2X56AB | TTM DIGITAL FILTER CP | SH 33: 10 | 1 |
|||||||||||||
| NT2X57AA | SIGNAL DISTRIBUTION CP | SH 33: 11 | 1 |
|||||||||||||
| NT5X30AA | 101 COMM TEST LINE | SH 33: 12 | 1 |
|||||||||||||
| NT1X90AA | TEST SIGNAL GENERATOR CP | SH 33: 13 | 1 |
|||||||||||||
| NT2X96AA | PCM LEVEL METER CP | SH 33: 14 | 1 |
|||||||||||||
| NT3X68AA | TONE GENERATOR, CALL WAITING | SH 33: 15 | 1 |
|||||||||||||
| NT2X09AA | MULTI-OUTPUT POWER CONVERTER | SH 33: 17 | 1 |
|||||||||||||
| NT2X70AE | POWER CONVERTER | SH 33: 20 | 1 |
|||||||||||||
| The Government will provide the following hardware: | ||||||||||||||||
| MCSM 00 | ||||||||||||||||
| NTNX29AA | MERIDIAN CABINET SERVICE MODULE | 0 |
||||||||||||||
| NTNX25AA | COMMON FRAMEWORK | 0 |
||||||||||||||
| NT7X34DA | FRAME SUPERVISORY PANEL (SH POS 60) | 0 |
||||||||||||||
| NT7X3004 | STM SHELF ASSEMBLY (SH POS 47,33,19,5) | 0 |
||||||||||||||
| NTNX27CA | COOLING UNIT (SH POS 00) | 0 |
||||||||||||||
| NTNX2515 | DOOR ASSEMBLY LEFT | 0 |
||||||||||||||
| NTNX2513 | DOOR ASSEMBLY RIGHT | 0 |
||||||||||||||
| SHELF POS 47 (STM-06/STM-07) | ||||||||||||||||
| NTNX29LA | STM PACK-FILL (E/W:) | 0 |
||||||||||||||
| NT0X50AG | FILLER FACEPLATE | 0 |
||||||||||||||
| NT0X50AC | FILLER FACEPLATE | 0 |
||||||||||||||
| NT4X65AB | TM CONTROL CP | 0 |
||||||||||||||
| NT3X68AC | TONE GENERATOR, CALL WAITING | 0 |
||||||||||||||
| NT3X67AA | 6-PORT CONFERENCE CP | 0 |
||||||||||||||
| NT2X48BA | MF RECEIVER CP | 0 |
||||||||||||||
| NT2X59AA | GROUP CODEC | 0 |
||||||||||||||
| NT1X00AB | 102 MW TEST | 0 |
||||||||||||||
| NT2X48BB | DTMF RECEIVER CP | 0 |
||||||||||||||
| NT4X65AB | TM CONTROL CP | 0 |
||||||||||||||
| NT3X67AA | 6-PORT CONFERENCE CP | 0 |
||||||||||||||
| NT0X50AA | FILLER FACEPLATE | 0 |
||||||||||||||
| NT2X59AA | GROUP CODEC | 0 |
||||||||||||||
| NT0X50AA | FILLER FACEPLATE | 0 |
||||||||||||||
| NT2X70AE | POWER CONVERTER | 0 |
||||||||||||||
| SHELF POS 33 (STM-04/STM-05) | ||||||||||||||||
| NTNX29LC | STM PACK-FILL (E/W:) | 0 |
||||||||||||||
| NT0X50AG | FILLER FACEPLATE | 0 |
||||||||||||||
| NT0X50AC | FILLER FACEPLATE | 0 |
||||||||||||||
| NT4X65AB | TM CONTROL CP | 0 |
||||||||||||||
| NT3X67AA | 6-PORT CONFERENCE CP | 0 |
||||||||||||||
| NT2X59AA | GROUP CODEC | 0 |
||||||||||||||
| NT0X50AA | FILLER FACEPLATE | 0 |
||||||||||||||
| NT2X70AE | POWER CONVERTER | 0 |
||||||||||||||
| SHELF POS 19 & 05 (STM-02, 03/STM-00,01) | ||||||||||||||||
| NTNX29LB | STM PACK-FILL (E/W:) | 0 |
||||||||||||||
| NT0X50AG | FILLER FACEPLATE | 0 |
||||||||||||||
| NT0X50AC | FILLER FACEPLATE | 0 |
||||||||||||||
| NT4X65AB | TM CONTROL CP | 0 |
||||||||||||||
| NT1X75AA | DRAM CONTROL CP | 0 |
||||||||||||||
| NT1X77AA | DRAM RAM MEMORY CP | 0 |
||||||||||||||
| NT3X67AA | 6-PORT CONFERENCE CP | 0 |
||||||||||||||
| NT2X59AA | GROUP CODEC | 0 |
||||||||||||||
| NT0X50AA | FILLER FACEPLATE | 0 |
||||||||||||||
| NT2X70AE | POWER CONVERTER | 0 |
||||||||||||||
| NTNX29AB | DRAM WIRING OPTION (SH 19) | 0 |
||||||||||||||
| Government will provide the following hardware: | ||||||||||||||||
| MCTMI-01 | ||||||||||||||||
| NTNX33CA | MERIDIAN CABINET ISDN TRUNK MODULE | 1 |
||||||||||||||
| NTNX25AA | COMMON FRAMEWORK | 1 |
||||||||||||||
| NTNX26NA | FRAME SUPERVISORY PANEL (SH POS 60) | 1 |
||||||||||||||
| NT6X0215 | CPCE SH ASSEMBLY (SH 47,33,19,05) | 1 |
||||||||||||||
| NTNX27CA | COOLING UNIT (SH POS 00) | 1 |
||||||||||||||
| NTNX2515 | DOOR ASSEMBLY LEFT | 2 |
||||||||||||||
| NTNX2513 | DOOR ASSEMBLY RIGHT | 2 |
||||||||||||||
| NTNX33DU | DS-30A LINKS | 1 |
||||||||||||||
| NTNX33DV | DS1 INTERFACE KIT | 1 |
||||||||||||||
| NTNX33DT | DS30A I/F HARDWARE KIT (NT6X48AA) | 1 |
||||||||||||||
| NTNX36NI | JUMPER KIT FOR BASE | 1 |
||||||||||||||
| LOWER MODULE SHELVES 05 & 19 | ||||||||||||||||
| NTNX33NA.DTC | CPCE PACK-FILL (E/W:) | 1 |
||||||||||||||
| NT2X70AE | POWER CONVERTER | 2 |
||||||||||||||
| NT6X41AA | SPEECH BUS FORMATTER CP | 2 |
||||||||||||||
| NT6X42AA | CHANNEL SUPERVISION MSG CP | 2 |
||||||||||||||
| NT0X50AA | FILLER FACEPLATE | 10 |
||||||||||||||
| NT6X44AB | TIME SWITCH CP | 2 |
||||||||||||||
| NT6X92BB | UNIVERSAL TONE RECEIVER CP | 2 |
||||||||||||||
| NT6X69AC | MSG INTERFACE CP | 2 |
||||||||||||||
| NT6X40AC | DS-30 NETWORK I/F CP | 4 |
||||||||||||||
| UPPER MODULE SHELVES 33 & 47 | ||||||||||||||||
| NTNX33NB.LTCI | CPCE PACK-FILL (E/W:) | 1 |
||||||||||||||
| NT2X70AE | POWER CONVERTER | 2 |
||||||||||||||
| NT6X41AA | SPEECH BUS FORMATTER CP | 2 |
||||||||||||||
| NT6X42AA | CHANNEL SUPERVISION MSG CP | 2 |
||||||||||||||
| NT0X50AA | FILLER FACEPLATE | 10 |
||||||||||||||
| NT6X44AB | TIME SWITCH CP | 2 |
||||||||||||||
| NT6X92BB | UNIVERSAL TONE RECEIVER CP | 2 |
||||||||||||||
| NT6X69AC | MSG INTERFACE CP | 2 |
||||||||||||||
| NT6X40AC | DS-30 NETWORK I/F CP | 2 |
||||||||||||||
| PROVISIONABLES: | ||||||||||||||||
| NT6X48AA | DS-30A LCM INTERFACE CP | 4 |
||||||||||||||
| NT6X50AB | DS-1 INTERFACE CP - ENHANCED | 3 |
||||||||||||||
| NTBX01AA | ISDN SIGNAL PREPROCESSOR CP | 4 |
||||||||||||||
| NTBX02AA | D-CHANNEL HANDLER CP | 2 |
||||||||||||||
| Government will provide the following hardware: | ||||||||||||||||
| MCLME - 03 | ||||||||||||||||
| NTNX38CA | MERIDIAN CABINET ISDN-E LINE MODULE | 1 |
||||||||||||||
| NTNX25AA | COMMON FRAMEWORK | 1032 |
1 |
|||||||||||||
| NTNX26LA | FRAME SUPERVISORY PANEL (SH POS 60) | 1 |
||||||||||||||
| NT6X30AA | RINGING GENERATOR | 2 |
||||||||||||||
| NTBX3118 | ISDN LCAI ASSEMBLY (SH POS 5,19,33,47) | 4 |
||||||||||||||
| NTNX27DA | COOLING UNIT (SH POS 00) | 1 |
||||||||||||||
| NTNX2515 | DOOR ASSEMBLY LEFT | 2 |
||||||||||||||
| NTNX2513 | DOOR ASSEMBLY RIGHT | 2 |
||||||||||||||
| LOWER MODULE SHELVES 05 & 19 | ||||||||||||||||
| NTBX38LE | ISDN LCME COMMON PACK-FILL (E/W:) | 1032 |
1 |
|||||||||||||
| NTBX35AA | ISDN DIGROUP CONTROLLER CP | 4 |
||||||||||||||
| NTBX34BA | ISDN LCME PROCESSOR CP | 2 |
||||||||||||||
| NT6X53CA | POWER CONVERTER | 2 |
||||||||||||||
| NTBX72AA | LCME BATTERY & RING ROUTER | 2 |
||||||||||||||
| NTBX32BA | ISDN LINE DRAWER | 1032 |
8 |
|||||||||||||
| NTBX3204 | ISDN ENHANCED LINE DWR ASSEMBLY | 8 |
||||||||||||||
| NTBX36BA | ISDN ENHANCED LCME BIC | 8 |
||||||||||||||
| NTBX71AA | ISDN ENHANCED LINE DWR PUPS | 8 |
||||||||||||||
| A0285591 | LINE DRAWER CUTOFF STRAP | 8 |
||||||||||||||
| NTX100AA | IBN LINE CHARGE | SRD | -430 |
|||||||||||||
| 00033465 | MSL ENHANCED SYSTEM LINE SOFTWARE ENABLER (480/LCME) | SRD | 430 |
|||||||||||||
| UPPER MODULE SHELVES 33 & 47 | ||||||||||||||||
| NTBX31AB | LCM FILLER FACE PLATE | 1032 |
1 |
|||||||||||||
| NT6X05AX | LINE DRAWER FILLER | 1032 |
8 |
|||||||||||||
| MCSS-00,01 | ||||||||||||||||
| NTNX22BA | MERIDIAN CABINET SPARES STORAGE | 0 |
||||||||||||||
| CONSISTING OF: | ||||||||||||||||
| NTNX25AA | COMMON FRAMEWORK | 0 |
||||||||||||||
| P0700829 | UTILITY TRAY | 0 |
||||||||||||||
| NTNX2201 | STORAGE SHELF ASSEMBLY | 0 |
||||||||||||||
| NTNX2513 | DOOR ASSEMBLY, LEFT | 0 |
||||||||||||||
| NTNX2515 | DOOR ASSEMBLY, RIGHT | 0 |
||||||||||||||
| MCSS PROVISIONABLES | ||||||||||||||||
| NTNX2201 | STORAGE SHELF ASSEMBLY | 0 |
||||||||||||||
| HOST MSL-100 HARDWARE PROVISIONING | ||||||||||||||||
| (TO BE INSTALLED IN THE EXISTING MCLM-02) | ||||||||||||||||
| UPPER MODULE SHELVES 33 & 47 | ||||||||||||||||
| NTNX38LB | ELM UPPER MODULE CP | 47,33 | 0 |
|||||||||||||
| NT6X52AA | DIGGROUP CONTROL CP | 0 |
||||||||||||||
| NT6X53AA | POWER CONVERTER CP | 0 |
||||||||||||||
| NT6X51AC | LCM PROCESSOR CP | 0 |
||||||||||||||
| P0687853 | DESIGNATION STRIP | 0 |
||||||||||||||
| NT6X05AA | LINE DRAWER CP | 1032 |
0 |
|||||||||||||
| A0384362 | LINE DRAWER CUTOFF STRAP | 1032 |
0 |
|||||||||||||
| NT6X17BA | WLC TYPE A LINE CARD WITH TEST | 1032 |
0 |
|||||||||||||
| 00033472 | SYSTEM LINE ENABLER NON-LCME | SRD | 0 |
|||||||||||||
| (TO BE INSTALLED IN THE EXISTING MCLME-03) | ||||||||||||||||
| UPPER MODULE SHELVES 33 & 47 | ||||||||||||||||
| NTBX31BC | ISDN LCME COMMON PACK-FILL (E/W:) | 1032 |
0 |
|||||||||||||
| NTBX35AA | ISDN DIGROUP CONTROLLER CP | 0 |
||||||||||||||
| NTBX34CB | ISDN LCME PROCESSOR CP | 0 |
||||||||||||||
| NT6X53CA | POWER CONVERTER | 0 |
||||||||||||||
| NTBX72AA | LCME BATTERY & RING ROUTER | 0 |
||||||||||||||
| NTBX32BA | ISDN LINE DRAWER | 1032 |
0 |
|||||||||||||
| NTBX3204 | ISDN ENHANCED LINE DWR ASSY | 8 |
||||||||||||||
| NTBX36BA | ISDN ENHANCED LCME BIC | 8 |
||||||||||||||
| NTBX71AA | ISDN ENHANCED LINE DWR PUPS | 8 |
||||||||||||||
| A0384362 | LINE DRAWER CUTOFF STRAP | 1032 |
0 |
|||||||||||||
| NT6X17BA | WORLD LINE CARD (TYPE A) - TEST | 1032 |
0 |
|||||||||||||
| NT6X99AA | IBERT CARD | 1032 |
0 |
|||||||||||||
| 00033465 | MSL ENHANCED SYSTEM LINE SOFTWARE ENABLER (480/LCME) | SRD |
0 |
|||||||||||||
| MTU/MTA FOR MCLME-03 (Being installed in the MCPM-00) | ||||||||||||||||
| NT2X10BB | MTU ANALOG CP | SH 47: 13 | 1182 |
1 |
||||||||||||
| NT2X11BA | MTU DIGITAL CP | SH 47: 14 | 1182 |
0 |
||||||||||||
| NT2X90AD | INC/OUT TEST TRUNK CP | SH 47: 15 | 1182 |
0 |
||||||||||||
| NT3X09BA | 8X8 METALLIC TEST ACCESS CP | SH 33: 8, | 1182 |
1 |
||||||||||||
| SECTION 2 : HOST MSL-100 HARDWARE PROVISIONING | ||||||||||||||||
| HARDWARE TO SNSE UPGRADE | ||||||||||||||||
| NT6X02UF | FIBER I/F HARDWARE ASSEMBLY | 1182 |
2 |
|||||||||||||
| NTNX33SD | DS-512 FIBER TO ENET | 1182 |
1 |
|||||||||||||
| NTNX33FK | DS-1 FILTER KIT (DTC) | 1182 |
1 |
|||||||||||||
| NTNX33DW | DS-1 FILTER KIT MOD 1 (DTC) | 1182 |
1 |
|||||||||||||
| NT6X50AB | DS-1 INTERFACE CP (Being installed in the existing DTCI-00 in MCTMI-01) | 1182 |
3 |
|||||||||||||
| NT6X40FA | DS-512 NETWORK I/F CP | 1182 |
2 |
|||||||||||||
| NT6X40GA | DS-512 NETWORK I/F PB | 1182 |
2 |
|||||||||||||
| NTNX33ZA | XPM PLUS UPGRADE KIT | 1182 |
1 |
|||||||||||||
| NTBX01BA | ISDN SIGNAL PREPROCESSOR CP | 1182 |
4 |
|||||||||||||
| NTBX02BA | D-CHANNEL HANDLER CP (Being isntalled in the LTCI-02 only) | 1182 |
0 |
|||||||||||||
| NTNX29BB | DS-30 CABLE KIT FOR MCSM | 1182 |
1 |
|||||||||||||
| NTNX29ES | FILTER KIT | 1182 |
1 |
|||||||||||||
| NT0X97AK | QUAD FIBER CABLE | FIBR | 4 |
|||||||||||||
| NTNX24YY | MCPM EXTERNAL DS30 CABLE KIT TO ENET | 1182 |
1 |
|||||||||||||
| NTNX37LJ | DS30 BULKHEAD MTM-STM CON MCAM TO ENET | 1182 |
1 |
|||||||||||||
| MCTM/MCSM/MCAM/MCSM/MCSS/MCLM/MCLME LABELS | ||||||||||||||||
| P0699158 | LABEL RIGHT DOOR (GRAY) | 1182 |
14 |
|||||||||||||
| P0818848 | LABEL LEFT DOOR (GRAY) | 1182 |
14 |
|||||||||||||
| P0687614 | CABINET TYPE LABEL (GREY) | 1182 |
14 |
|||||||||||||
| P0699158 | LABEL RIGHT DOOR (GRAY) | 1032 |
8 |
|||||||||||||
| P0818848 | LABEL LEFT DOOR (GRAY) | 1032 |
8 |
|||||||||||||
| P0687614 | CABINET TYPE LABEL (GREY) | 1032 |
6 |
|||||||||||||
| A0384362 | LINE DRAWER CUTOFF STRAP | 1032 |
40 |
|||||||||||||
| P0732593 | CABINET TYPE LABEL (GREY) | 1032 |
2 |
|||||||||||||
| MDF FOR NEW EQUIPMENT | ||||||||||||||||
| NTY607AA | MISC. HARDARE KIT UP TO 25 FRAMES HOST | 116 |
1 |
|||||||||||||
| NTNX2540 | NTI NTNX2540 EARTHQUAKE ANCHOR KIT | 116 |
6 |
|||||||||||||
| A0382137 | HOMACO AW12X32C-166 TB (LINES 3/LCME) | 3511 |
18 |
|||||||||||||
| A0378839 | HOMACO AW8X25C-154 TB 2/MCAM | 3511 |
2 |
|||||||||||||
| NTNX36AT | NTI NTNX36AT LINE MOD TO MDF CABLE | 137 |
88 |
|||||||||||||
| NTNX36RI | NTI NTNX36RI MCTM TO MCLM | 139 |
4 |
|||||||||||||
| NTNX36BD | NTI NTNX36BD DTC/LTC TO DSX CABLE | 139 |
4 |
|||||||||||||
| NTNX36AQ | CABLE FROM MCAM TO ENET | 139 |
0 |
|||||||||||||
| NTNX36AQ | CABLE FROM MCPM TO ENET | 139 |
4 |
|||||||||||||
| DSX | ||||||||||||||||
| A0383751 | ADC DSX-DR19 64 JACKS PANEL | 639 |
1 |
|||||||||||||
| A0601544 | ADC PATCH-CORD - PJ722 (6 FT DUAL BANTAM) | 639 |
2 |
|||||||||||||
| A0384118 | ADC PATCH-CORD - PJ946 (6 FT BANTAM TO 310) | 639 |
2 |
|||||||||||||
| R0111687 | DSX-CCW CONDUCT X-CONN | 639 |
IN FEET |
200 |
||||||||||||
| SECTION 2 : HOST MSL-100 HARDWARE PROVISIONING | ||||||||||||||||
| MISCELLANEOUS HARDWARE | ||||||||||||||||
| R0113440 | XHHW-UL-VW-1 #4/0 MCM POWER WIRE | 484 |
400 |
|||||||||||||
| NT0X07SB | NTI NT0X07SB GROUNDING KIT HDW | 484 |
1 |
|||||||||||||
| A0383667 | SAUNDERS BROS. SK-8410-GR CA RK SUPP BRKT | 4071 |
6 |
|||||||||||||
| A0386313 | SAUNDERS BROS. SB-119-E-GRY PWR CA SUPP BRKT | 4071 |
15 |
|||||||||||||
| A0383713 | SAUNDERS BROS. SB-117-A CA RETAINING POST | 4071 |
30 |
|||||||||||||
| A0370114 | SAUNDERS BROS. SB-2209-A FRAMING CLIP KIT | 4071 |
4 |
|||||||||||||
| A0386093 | SAUNDERS BROS. SB-20-5-120 GR 2" SUPP TUBE (10') | 4071 |
1 |
|||||||||||||
| P0645604 | SAUNDERS BROS. SB-1006-C 3/8" EXP SHIELD | 4071 |
20 |
|||||||||||||
| A0384402 | NEWTON A-10048-2 FLOOR ,MTG HDW KIT | 4071 |
3 |
|||||||||||||
| A0300107 | NEWTON 2052 PWR CA SUPP BRKT | 4071 |
7 |
|||||||||||||
| POWER HARDWARE | ||||||||||||||||
| A0377832 | LORAIN 4316-019 101-201A FUSE PANEL (4 POS) | 810 |
1 |
|||||||||||||
| A0355112 | LORAIN LPN 3627-557 LUG ADAPTER | 810 |
4 |
|||||||||||||
| A0315426 | LORAIN 2484-637 150A RL LINK FUSE | 810 |
4 |
|||||||||||||
| R0114199 | 350 MCM STRANDED CABLE IN FEET | 810 |
IN FEET |
400 |
||||||||||||
| A0297951 | 350 MCM LUG 2/1/2" HOLE 1 3/4" SPACING | 810 |
8 |
|||||||||||||
| A0319010 | 4029 23" GROUND BAR NEWTON | 810 |
1 |
|||||||||||||
| R0112324 | 22 AWG CABLE BLACK | In Feet | 810 |
300 |
||||||||||||
| R0112052 | CA 2/24 AWG SHIELDED AUDIO CA (MCLM TO MCAM) | IN FEET |
100 |
|||||||||||||
| MISC HARDWARE | ||||||||||||||||
| QFF3A | A0205210 | DUMMY FUSE | 1071 |
5 |
||||||||||||
| NT0X42AJ | B0208773 FUSE 10 AMP | 1071 |
10 |
|||||||||||||
Eielson AFB SSIP
Attachment B
Lineup of GFE Frames to be Installed
ATTACHMENT 1 - Floor Plan (Drawing S021-01 Rev W1 )

EIELSON AFB SSIP
Attachment C
Eielson Host Drawings
Eielson AFB SSIP
Attachment D
Eielson AFB ISRD
Eielson AFB, Alaska
INSTALLATION SUPPORT REQUIREMENTS DOCUMENT
1.0 Introduction
The following is an Installation Support Requirements Document (ISRD) required for the EFI& T of GFE frame relocation at the Host digital phone switching system located at Eielson AFB Alaska. This ISRD details a set of support items or services that may be required of the Government during an upgrade/installation.
1.1 Assumptions
This ISRD covers the upgrade/installation. Deinstallation of the system from the original site was not considered. Deinstallation would potentially require the Government to be responsible for additional support tasks at the original site such as decommissioning, inventory, transportation, etc. (as applicable).
Post installation tasks such as input of service orders and system operation tasks are also not addressed in this document.
1.2 Reference Material
RFTP-F04606-95-R-0042, 27 February 1996; Change 1, 21 March 1996
SM-ALC WIDTS SOO- 95-0001, 23 February 1996
WIDTS-EPS-95-001 Change 1, 22 March 1996
RFTP-F04606-95-R-0042, Attachment 2, Instruction for Preparation of Technical Proposals
SOW- WIDTS-TBD, 16 May 1996
DI-MGUTAH-80033, Site Preparation Requirements and Installation Plan
2.0 Government Site Upgrade/installation support tasks.
2.1 Database Requirements: Not applicable
2.2 Demarcation Locations: See FFP Delivery Order Proposal WIDTS-99-P-0080
2.3 Seismic Zone Requirements
General Dynamics will design the system to meet the site specific SOW seismic zone requirements. The Government shall be responsible for all existing equipment unless stated in the SOW (as applicable).
2.4 Floor Loading
The Government shall, if required, provide additional floor bracing to support the equipment and infrastructure loading. Refer to the General Dynamics Office Drawing for equipment weights, dimensions, and equipment layouts (as applicable).
2.5 Floor Elevation
The Government shall ensure the maximum deviation from the established floor elevation should not exceed 3/4". The maximum difference in elevation between high and low points in any given 20' square should not exceed 3/4" (as applicable).
2.6 Ceiling Height
The Government shall ensure the minimum Switch Room heights as follows: (as applicable.)
Minimum of 8'-6" where the MDF is 7' high.
Minimum of 9'-6" where the MDF is 8' high.
Minimum of 10'-6" where the MDF is 9' high.
2.7 Clearance Height
The Government shall ensure that a clearance from the finished floor and the underside of the lowest obstruction, such as vent ducts, beams, false ceilings, water sprinklers, etc., will be a minimum of 8'-0" for all areas associated with the Meridian SL-100 switch (as applicable).
2.8 Power Distribution System
General Dynamics will provide to the Government the quantity and size of breakers required; the Government shall:
2.8.1 Locate and define AC power feeder services to the Switch Room including information such as number of phases, capacity (KVA), frequency and amplitude.
2.8.2 Locate and define the Technical Power Panel (TPP):
Number of Breakers
Size of Breakers
Number of Poles/Breaker
Space available in TPP for additional breakers
Government shall run, secure, & terminate commercial AC from TPP to any and all General Dynamics or GFE provided rectifiers(To include all wiring and conduit.)
2.10 DC Power Requirements : See Site Survey Report (Attachment B).
2.11 Storage/Staging Area
The Government shall provide a secure and dry storage/staging facility for all installation related materials adjacent to or as close by the switch area as is practical.
2.12 Transportation Support
The Government shall provide transportation support for the equipment that is stored in a location other than the switch facility. A 24 hour notice will be given by the GTE Site Supervisor regarding the transfer of equipment. A truck with a lift gate, a forklift, and a dolly are recommended for delivering the materials to the installation site. The Government shall be responsible for delivering switch materials from the storage area to a pre-established point within the switching facility.
2.13 Equipment Access
The Government shall ensure entry to the facility of all equipment.
The Government shall indicate the availability of loading docks and equipment elevators.
The Government shall ensure that there is a route between the unloading area and the Switch Room where no restrictions will be encountered with less clearance than 30" wide (side to side) and 84" high (floor to obstructions).
2.14 Maintenance and Administration Position (MAP) (GFE)
2.15 Environmental Air Cleanliness : See Site Survey Report (Attachment B).
2.16 Temperature
The Government shall ensure that the required ambient temperature range of the switching area is between 10 and 30 degrees centigrade (50 to 86 degrees Fahrenheit), with extreme limits set at 5 to 49 degrees Centigrade (41 to 120 degrees Fahrenheit). The maximum rate of temperature cycling should not exceed one degree Centigrade per minute. Extreme temperature and relative humidity conditions are based on a maximum duration of up to 72 continuous hours and up to 15 days per year. The battery manufacturer recommends that the battery temperature be maintained at 77 degrees Fahrenheit for maximum battery life efficiency. The required operating relative humidity range is between 20 and 50 percent with extreme limits set at 20 to 80 percent.
2.17 Thermal Dissipation
The Government shall provide sufficient cooling for all site equipment.
2.8 Grounding : See Site Survey Report (Attachment B).
2.19 OSP Requirements
The Government shall be responsible for all aspects of the outside plant installation.
2.25 Cable Rack Support (See Engineering Documentation Package Summary.)
2.26 Site Utilities
The Government shall provide all site utilities (water, sewage, etc.).
2.27 Lighting
The Government shall ensure that adequate room lighting will be provided in all rooms associated with the Meridian SL-100 Switch. The lighting plan should be arranged in such a manner that the illumination is directed toward the switch aisles. Additional lighting should be provided at the front and rear of interface frames and the Main Distribution Frame (MDF) to facilitate detailed installation tasks. Aisle lighting will be 50' candles at 30" above the floor.
2.28 Fire Detection/Protection Equipment
The Government shall provide and install any required fire detection and/or protection equipment that may be required according to the governing codes, including OSHA directives.
The Government shall provide a fire protection system.
2.29 Safety/Intrusion Alarms
The Government shall provide a site alarm system per the Governments requirements, such as smoke, water, and intrusion. General Dynamics will, where possible, connect General Dynamics furnished equipment alarms to this system if required by the site SOW.
2.30 Building Code Violations
The Government shall be responsible for correcting all governing building/OSHA code violations (i.e., asbestos, lead paint, etc.).
2.31 Ventilation
The Government shall ensure that the allocated space for the Meridian SL-100 and all associated equipment are provided a positive ventilation.
2.32 Site Renovation/Restoration
The Government shall renovate the site facility as needed prior to installation per the General Dynamics Office drawings.
The Government shall furnish General Dynamics a site specification sheet (interior/exterior building styles). General Dynamics will furnish any materials and/or services required to restore any damages to the work location back to its original condition (including painting, replacing floor tiles, etc.) in accordance with Government specifications.
2.33 Local Telephones (not applicable)
2.34 Leased Lines and Trunks (not applicable)
2.35 Test Phones (not applicable)
2.36 Parking
The Government shall make adequate parking space available for the installation team within a reasonable distance from the switch site.
2.37 Personnel Access
The Government shall provide to site survey and installation personnel escorted or unescorted security clearances required for access during normal business hours to all areas associated with the installation. If required, General Dynamics will request access outside normal business hours.
2.38 Personnel Housing (not applicable)
2.39 Office Space (not applicable)
2.40 Testing and QA/QC Inspections
The Government shall witness and authenticate all testing, QA/QC inspections, and audits.
2.41 Planned System Outages
The Government shall notify General Dynamics as soon as possible of any planned outages.
2.42 FCC Certification (not applicable)
2.43 Host Nation (not applicable)